Temporary Residence - Lawful Remunerated Activities: decision and post-grant stages
By Sam Parks · Last checked:
No verified universal end-to-end decision range in the reviewed procedure. Grant validity, contract requirements and post-grant stamp, entry and ID deadlines are separate.
Assessment and later deadlines
No verified universal overall decision range. The accepted-offer branch has a 90-calendar-day initial grant and 45-calendar-day contract filing from actual entry; these are not decision deadlines. After a grant abroad, electronic-stamp download is within 120 working days and entry within 90 calendar days of download, with the ID appointment within 30 days of entry.
Track the actual application, answer evidence requests and follow the current payment and grant instructions. A portal receipt does not authorise work. Renewal must satisfy the actual current contract/job and at-least-60% prior-activity test.
Actual decision, stamp and arrival stages
No verified universal end-to-end SERMIG decision-time range is established by the reviewed category procedure. Assessment, additional-document requests and payment are separate. Contract length, the 60% renewal test and grant validity are not processing times.
SERMIG: lawful remunerated employment and servicesAfter a grant abroad, download the electronic stamp within 120 working days from grant notification and enter Chile within 90 calendar days of download. The permit starts on actual entry. These are post-grant deadlines, not application decision times.
SERMIG: electronic stamp, activation and arrivalRequest the civil-ID appointment within 30 days of entry after an overseas grant. For a grant in Chile, the appointment deadline runs from electronic-stamp download. Follow the actual domestic payment and activation instructions where applicable; a dependant obtains the stamp after the principal has obtained and activated theirs.
SERMIG: electronic stamp, activation and arrival
Validity, continuing basis and permanent residence
Generally up to two years with conditional renewal. The accepted-offer branch instead begins with 90 calendar days and a one-year first extension after the required contract stage. Permanent residence is a separate eligible application.
Permanent residence requires a separate eligible application. The general qualifying period is 24 months; actual statutory reduction conditions may support at least 12 months, while absences and other relevant factors can increase the requirement up to 48 months. A job, a services contract or an initial residence grant does not guarantee permanent residence.
Fees depend on nationality and the actual payment order. The currently linked schedule gives a USD 85 reference for one specified non-exempt German adult; it is not a universal charge or total moving budget. Identity cards, documents, translation and travel are separate.