ONE Pass AI and Tech Track (planned opening: 28 January 2027): application status and separate stages

By · Last checked:

Planned opening: 28 January 2027. Not currently accepting applications.

Applications are scheduled from 28 January 2027. No live AI-and-Tech-specific decision period was verified before opening; current mainstream processing references are not certified as future-track timings.

Check the status and actual stage

This is a scheduled future track, not a currently open application or a verified decision period. Do not substitute current mainstream ONE Pass processing or Tech.Pass timing.

Current application status
Planned opening: 28 January 2027. This track is not currently accepting applications and is excluded from current route recommendations.
Preparation
Read the announced compensation, experience, employer and document criteria. Publication of those criteria does not verify a live application channel.
At opening
Follow the actual MOM application, fee and decision-stage instructions. No future-track-specific processing period was independently verified before launch.

Validity and continuing conditions

A planned eligibility track within ONE Pass. MOM describes ONE Pass first grants as up to five years generally; any actual future grant, renewal and conditions require the applicable published procedure and decision.

Future track: applications are scheduled from 28 January 2027, not currently open. The announced criteria may be prepared for, but the actual launch, operational form, future-specific fees/timing and individual decision are not verified. This guide must not be treated as present permission to apply, enter or work.

Fees and separate permissions

No AI-and-Tech-specific application or issuance charge was independently verified before the scheduled opening. Check MOM’s actual future procedure; this guide does not treat a current mainstream ONE Pass fee as a certified future-track quote.

Current mainstream ONE Pass, a future eligibility track, married-spouse DP consent and common-law LTVP consent have different scopes. Do not copy a charge or timing between them.

Official processing and status sources

Frequently asked questions

Is this a guaranteed application-to-work timetable?+

No. The AI and Tech track has a scheduled future opening. A live application and future-track-specific decision period have not been verified before that date.

Are the application fee and processing time confirmed?+